Edwin
Edwin
Información
- Suspendido
- Nombre de usuario
- Edwin
- Miembro desde
- Visitas
- 6,743
- Última vez activo
- Roles
- Forista
- Puntos
- 17,792
- Insignias
- 13
-
Cotecmar
Solo les diré una cosa, el gobierno está muy comprometido con que el sector astillero sea una "locomotora" de desarrollo para el país. De apoco se están creando y encadenando clusters metalmecánicos que proveerán a este sector.
-
Cotecmar
TOLEDO escribió:Edwin escribió:Qué opinan?COTECMAR eyes new Colombian Navy OPV contract
The Colombian Navy (ARC) and state-run Science and Technology Corporation for the Development of Naval, Maritime, and Riverine Industries (COTECMAR) could sign a construction contract around 2020 for three locally designed ocean patrol vessels (OPVs).
Design work for the new OPV-90 Mk II (alternatively known as OPV 93 C) started in 2015, and likely two more years are needed to complete the last design stages before a contract is signed “perhaps around 2020”, Captain Fredy Zarate Patarroyo, COTECMAR design and engineering manager, told reporters in Cartagena on 25 September.
The Navy commissioned ARCVictoria in July and operates two similar platforms, 20 de Julio and 7 de Agosto , which are all based on Fassmer’s OPV-80 model and built by Colombia’s state-run COTECMAR.
http://www.janes.com/article/74384/cotecmar-eyes-new-colombian-navy-opv-contract?from_rss=1
Se me hace muy lejos la firma del contrato para las nuevas OPV, 2020, esta muy lejos, deberían meterle a otra OPV-80 como la Victoria, con cañón de 76 mm.
Que va a hacer Cotecmar en ese tiempo, solo el BDA que próximamente se va a construir???
Recordemos que nos quedan las CPVs, así que hay mucho por construir antes de 2020. -
OPV 2G (OPV´S colombianas de segunda generación)
COTECMAR eyes new Colombian Navy OPV contract
The Colombian Navy (ARC) and state-run Science and Technology Corporation for the Development of Naval, Maritime, and Riverine Industries (COTECMAR) could sign a construction contract around 2020 for three locally designed ocean patrol vessels (OPVs).
Design work for the new OPV-90 Mk II (alternatively known as OPV 93 C) started in 2015, and likely two more years are needed to complete the last design stages before a contract is signed “perhaps around 2020”, Captain Fredy Zarate Patarroyo, COTECMAR design and engineering manager, told reporters in Cartagena on 25 September.
The Navy commissioned ARCVictoria in July and operates two similar platforms, 20 de Julio and 7 de Agosto , which are all based on Fassmer’s OPV-80 model and built by Colombia’s state-run COTECMAR.
http://www.janes.com/article/74384/cotecmar-eyes-new-colombian-navy-opv-contract?from_rss=1
-
INDUMIL
Indumil Colombia@IndumilColombia 21 hHace 21 horasAlrededor de 400 personas laboran en nuestros procesos industriales metalmecánicos en #Sogamoso Indumil #MásQueArmas promueve el #Desarrollo


-
Posible MBT para el Ejército Nacional de Colombia
Si van a venir con algo, que sea con LEO 2A6-7 o con K2 black panter con su munición destapalatas guiada.



